

🎬 Elevate your entertainment setup with True HQ’s 15m 4K HDMI cable — because your visuals deserve the best!
The True HQ 15m 4K HDMI Cable delivers ultra-high-speed 18Gbps bandwidth supporting 4K@60Hz with HDR10, ARC, and HDCP 2.2. Built with triple-layer shielding, gold-plated connectors, and a flexible yet durable jacket, it ensures interference-free, long-distance signal transmission. Compatible with all HDMI 2.0 devices including gaming consoles, TVs, and projectors, this cable is designed for professional and home AV setups requiring reliable, high-quality video and audio performance.








| ASIN | B07TK44BL7 |
| Best Sellers Rank | 87 in HDMI Cables |
| Guaranteed software updates until | unknown |
| Item model number | TRUEHQ-HDMI-15M |
| Manufacturer | True HQ |
| Package Dimensions | 25.9 x 21 x 9.1 cm; 890 g |
A**H
HDMI long leads 10m for TV and projector
Good quality product delivered promptly with no issues.
N**3
For tidy installation
Great quality product, i ordered the 10 metre cable so I can plumb it in properly around the edge of the room to stop people tripping over it. The insulation feels nice and thick as well.
M**N
Ok
Really long works well ok quality Seems a little expensive
M**N
good stuff
been using this for a few months between two buildings via some piping, has worked a treat
D**F
Good quality, great length. Like me
Can't fault this for the money. Needed a long length to run a projector to a laptop and this fitted the bill. One thing to note and this is nothing to do with the product, if you're using an adapter as I was with a Surface (mini DP to HDMI) it doesn't work. It's fine for a monitor up to about a metre away but at this length the signal needs power. Once I'd sorted that conundrum out and swapped to a laptop with a dedicated HDMI port all was good. Recommended.
J**Y
Just right
Fantastic
A**K
Dont work, blinking on screen
Brought 2 of these and neither of them work, clearly they arent being tested sufficiently. But this wasnt the only issue, they arrived 2 days later than they should of, so with these 2 issues clearly this company should be avoided at all costs. Tested my ports and devices witg existing and old HDMI leads and the ports and devices work perfectly, it is clear that its these HDMI leads that are dodgy. Will be requestinf a refund as i can no longer trust these leads for going out to wedding venues. As they will be unreliable.
H**D
nice
Does what it says which is refreshing.
M**H
I think it's a very good material with excellent quality of manufacturing with this length.
S**R
good
B**R
يعمل على pc لقد قمت بتوصيل السلك على الشاشة ويعمل جيدا عليك ان تقلل من جودة البث لكي يعمل بشكل جيد
L**U
Cable hdmi de très bonne qualité
M**T
Das Kabel war gut verpackt, die Lieferung erfolgte sehr schnell und die Qualität ist top
Trustpilot
4 days ago
1 month ago